The required clearance in front of the panel depends on what's directly facing it on the opposite wall: 36" – If facing a non-electrical wall. 42" – If facing a grounded surface (e....
Contact online >>
Side clearance: There should be a minimum of 30 inches of clearance from the sides of all electrical equipment, but in no case less than the width of the equipment itself. This is referred to as the side-to
There must be at least 78 inches (6′ 6″) of vertical clearance in front of the panel from the floor up to the ceiling or any obstruction. This is to allow someone to stand and work safely. The
For indoor electrical installations, the dedicated space must be of equal depth and width to that of the equipment itself and extend from the floor to a height of 1.83 meters (6 feet) above the
Every electrical panel, breaker box, meter base, and service disconnect needs a clear working zone in front of it so that someone can safely operate the equipment or respond to an
The National Electrical Code provision 110.26 clarifies that electrical boxes must be supplied with at least 3 feet of free space surrounding them for safety measures.
Depth: 3 feet minimum from the panel face to any wall or obstruction. Width: If the panel is 24 inches wide, the space must be at least 54 inches wide (24″ + 30″). Height: 6.5 feet from the floor.
Clearance: Electrical panels must be installed in a readily accessible area with a minimum clearance of 30 inches (762 mm) wide, 3 ft (36 inches or 914 mm) deep, and 6.5 feet (≈ 2 meter) high in front of
Per NEC 110.26 (D), all working spaces must have a minimum Electrical equipment headroom of 2.0 m (6 ft 6 in), measured from the floor or platform to the ceiling or any overhead obstruction like pipes or
This document provides safety clearance recommendations for electrical panels. It includes tables outlining minimum clearance distances for various components of indoor and outdoor electrical panels.
Panels with 151 to 600 volts should have 42" of clearance around it. This NEC working clearance will provide not only the person working on the equipment with room, but also their tools.
Prefabricated micro-modular data centers and edge pods, scalable from 5 to 50 racks, ready for 5G and edge AI workloads.
Single-phase immersion cooling tanks and direct-to-chip liquid cooling switches, achieving PUE below 1.1.
GPU-accelerated AI servers, high-density server racks, and network cabinets optimized for AI/ML workloads.
Real-time data center infrastructure management, plus overhead cable trays and fiber bridges for structured cabling.
We provide custom data center infrastructure solutions, from micro-modular DCs to immersion cooling and AI-ready racks.
From design to deployment, our team ensures energy-efficient, scalable, and carrier-grade digital infrastructure.
Al. Jerozolimskie 180, Entrance B, 02-486 Warsaw, Masovian Voivodeship, Poland